Tuesday Wk 2

We started early today in the hope that we might avoid the worst of the heat. The plan sort of worked but it was 18 degrees at 8am and rose to about 26 degrees which was exhausting.

The day got off to an excellent start (!) with a portaloo fiasco. Apparently our toilet was positioned by the hire company in such a place that they can’t empty it. Here’s hoping they move it to a better spot soon.

IMG_0128

 

On a more positive note work progressed well in Trench B. Kimberley, Chris, Sue and James G finally resolved the deep slot they’ve been digging for the last few days. It proved to be a large ditch or holloway with a number of fills. The lowest fill, which was dark grey, produced a large fragment of animal bone and also a small, black soapy feeling sherd that might be pre-Norman…

IMG_0137

We also had a special visitor to site today: Woofton. Woofton is the dig mascot given by Min to her Daddy. Woofton had great fun playing on site and with the team.

IMG_0136

Elsewhere in Trench B pretty much the entire team continued to excavate a thick layer which is producing medieval pottery. In the hot dry conditions finds recovery was aided by Bill and James SA’s meticulous sieving. What’s under this layer remains something of a mystery that has Andy and James scratching their heads.

Over in Trench A Hayley and Flora spent the day excavating the stoney feature (almost certainly a recent field drain) and drawing sections.

Late in the day Bill did a run to the supermarket for some icecreams, which were desperately needed by the digging team. Food tonight was excellent fajitas served up in exemplary style by Lucy and Ollie.

 

Leave a Reply