The shelving installation at Team Valley is now complete. In addition to shelving for books and journals, the installation also includes picture racking (below).
Work is continuing in the Robinson Library on Levels 4 and 1 week, as we move the PER 530 (Physics) and PER 540 (Chemistry) journals. This work will take all week, so, again, Level 3 is likely to be the quietest place to study.